Open MikeMillerGIS opened 5 years ago
one change we need to make to be consistent. Taps need to be added on the load side of the primary meter to keep phase assignment correct. This would mean that the line would need a line end and there would be three taps on the line, one per phase, with associations to the switch. There would be no association from the line end to any equipment other than the pole.
An example of a Overheaed Primary Meter, with optional fuses and arresters