Open pscrozi opened 4 months ago
All of these are now running. Should be finished by 2/16, then declared done once it has run with full FSI, gained stability, and flatlined.
One run stopped prematurely. One made it to almost 4000 Nalu-Wind timesteps. Kevin will look at all of these and do some post-processing and report back. Did region III with damping and the one with added tip mass, and one with more Picard iterations (5 instead of 2).
Reviewed results yesterday. See issue 85.
All have run, seem to be stable.
Have been submitted and are running.