Document prepared by Colleen and Shelley L. Winterizing the Base of Operations

Tasks that can be done now for winterizing

Tasks when plantings are completed (after October 28 final plantings)

smlambert commented 1 day ago

Gravel to be moved to field 3 at exist near Hügelkultur

To clarify, this is not to move gravel into the field, but to create a ditch crossing into the field. In fact, there are 2 locations for 2 new 'crossings' (one into field 3 where the long hugel is on the right as you enter the field, and two at field 4 just past the tiny forest demonstration plots and where one of the new signs is placed). They will not need to be like our other ditch crossings, as they are in locations where the ditch is 'shallower'.

I had understood we had some extra 4" diameter pipe that could be laid down along with some gravel, so water does not dam up on either side of the new crossings.

This will not use up all of the extra gravel, but once we move the plastic shed, some of the extra gravel can be used to level the area in front of greenhouses and around the water pump. We can also then allocated parking areas to ensure that there are still 2 parking spots reserved for Nanabush, 1 swing spot for Sundaura and 2 spots to the right of the wooden shed for FCF. Then we can also ensure that the 'non-FCF' parking does not get blocked by FCF "stuff", including tipped over trees, EV trailers and contents, traffic cones, etc. Let's try to think of the site as a neighbourhood and try to avoid blocking the neighbours driveways.