The enclosures for the SOL, Non-Boom, and RAD ebay sides have been arranged for the flight configuration. However, the following enclosures are still excluded: battery box, CSBF science stack, TOF switches, SIP, LabJack.
The Non-boom LV/HVPS has to be done in ad hoc fashion since the box has to be mounted vertically (space constraints), but was designed to be mounted horizontally. A vertical orientation has implications on thermals, so the LV/HVPS is being put onto a platform where it can be thermal connected to the EBY wall for TVAC testing.
(As of this moment) The SOL and Non-boom sides have been drilled for electrical enclosures. The RAD side will be drilled later today.
All the CBE RATs have already been drilled and mounted. COR RATs will be drilled and mounted at Nevis.
All the "necessary" electrical enclosures need to be arranged for TVAC, and the EBY needs to be drilled accordingly.