Open rocco8773 opened 1 year ago
Paddles selected for this panel...
20 Jun. 2023: panel strapped, torqued, recorded, and labeled
When testing out strapping techniques, the inner edge of the slot (no the sandwich panel) between paddles 152 and 153 cracked. The end of the crack with drilled so it would propagate, and then filled with epoxy.
20 Jun. 2023: recorded in spreadsheet
#86 needs to be completed firstChosen as PID-19 with paddles 152-154.
Paddle Mappings