GEOS-ESM / GEOSana_GridComp

Repository containing code for data analysis for the GEOS Earth System Model data assimilation
Apache License 2.0
1 stars 3 forks source link

Patch FP: Changes to observing system from Rob/Mark. #159

Closed rtodling closed 8 months ago

rtodling commented 8 months ago

These have been provided to me by the OPS guys to be part of a update/patch to FP (5.29.5-p4):

2) SNPP safe mode. We bungled the shutting off of this data. Please use the special files I have provided for you above. https://progress.nccs.nasa.gov/trac/esma/ticket/2347

a) ATMS we want to shut off as the stats did not look good for the first few hours of data after the safe mode. (or maybe that will always happen when the data first returns?)

b) In hindsight, Kris thinks we need to take no action for OMPS, so no change to gmao_ozinfo_db for this.

3) NOAA-15 transition of ground services (turn off AMSU-A). Updated satinfodb files.

https://progress.nccs.nasa.gov/trac/esma/ticket/2342

4) Metop-C noise channels 4,5,6. Updated satinfodb files. https://progress.nccs.nasa.gov/trac/esma/ticket/2338

We turned these off in FP on 10/20, but probably would have been better to do so earlier. In your file, I chose 10/17 00z.

5) NOAA-20 safe mode https://progress.nccs.nasa.gov/trac/esma/ticket/2327

We were late turning this off in FP. I have adjusted the start date to be 6 hours before safe mode.

6) turn off N15 AMSU-A channels 4-5 https://progress.nccs.nasa.gov/trac/esma/ticket/2319

Will set turn-off date to match the one we chose for MERRA-2, 2023-09-05.

7) turn off NOAA-18 during transition of ground sevices https://progress.nccs.nasa.gov/trac/esma/ticket/2317

Adjusted start time to match disappearance of data.

8) side 1 electronics on the SNPP CrIS instrument failed https://progress.nccs.nasa.gov/trac/esma/ticket/2307

We turned it off before the switch to Side 2. I am turning it off in your files just prior to the Side 1 failure.

9) Metop-B MHS unstable https://progress.nccs.nasa.gov/trac/esma/ticket/2293

I changed this to be the dates we turned off for MERRA-2

NOTE: Number (1) in the list above referred to something other than GSI/obs-sys.