Examine effect of enhanced management scenarios within VAhydro
Compare CBP Phase 5.3.2 and VAHydro historic model runs in Roanoke River basin above Smith Mountain Lake.
Identify changes due to enhanced reservoir management in VAHydro on model performance as compared to USGS gages.
Locations
Roanoke River, Wayside Park (See: Appendix H.3: USGS Gage 02054530 vs. OR2_8130_7900)
Spring Hollow pump store
possible double-counting of withdrawal (w/d from river to reservoir, AND, w/d from reservoir by water system)
no flowby in river modeled, could lead to zero flows even if double counting not occuring
Hyco Dam NC (optional). Included because we did some good investigation here, and if we have extra time, or someone is looking for ideas for a class project (hint, hint) it is a golden opportunity to see if we can alter the base HSPF, as well as build a cool VAHydro model.
Reservoir FTABLE copied from Jennings Randolph
Will this have any impact on our water supply work? If not, priority can be lowered. OWS will analyze water use here to determine.
From Workplan:
Locations
Specific Analysis Roanoke, Wayside