Closed Helveg closed 2 years ago
[X] start 5500ms
[x] possibly eleminate stim if due to grc
[x] panel C & E
[ ] panel C: compare to knockout
[x] panel E:
[x] panel F: reproduce, together with the stepped index and strength index (+ pos & graph layout in suppl)
[x] knockout gap junction: redo sims (cla pizdaint)
Predictions:
[x] Sim with GABA, 2.5 gap
[x] ~Sim with 10x gap no GABA [error]~
[X] Sim with 5x gap no GABA
GABA disturbs temporal processing.
x5 gap no GABA too much sync spikes in the network (80% instead of 30%)
--> Try 2.5x gap with GABA
εύρηκα 🎉
Draft panels