As part of the management process to develop in Panorama, first a requirements document that has been reviewed by the technical inter agency community (including OGAC) needs to be submitted for review to ensure it meets the vision of the pano redesign and is consistent with the rest of the platform.
Comprehensive analytic questions in line with other dossiers - a portion of these will be inserted in each page in the dossier
Make sure questions are routine monitoring questions and not ad hoc one off analytic questions that will time out of utility quickly
Dossier addresses multiple audiences:
S/GAC Front Office
S/GAC Program/SI
Interagency Program/SI
Agency Program/SI
Field Based Program/SI
Useful for:
routine reporting requirements (CN/COP)
known meetings/conferences where this technical area is presented
6 quarters for trends
Selectors
Org level selector (called comparison level)
Age/sex disagg selectors
Specific Outline
Cover page
Disagg completeness table
Ch: Overview
Summary overview of technical area
Context page - showing disaggs/different visuals
Current quarter
Results against targets and % achievements - see testing
Age/sex pyramids - example - tx, cc, teesting
Distribution visuals (disaggs)
Cascades
Site level results?
Trends
Total numerator
Trends of disaggs
Age/sex trends
Calculations of metrics
Standard metrics =
Metrics unique to this technical area
Feedback - General
Inserted a new row into the requirements doc "Time Period"
Please specify the time periods that will be included in this dossier. Recommendation is for most dossiers at the total numerator level to go as far back as possible. For age/sex trends, only data from 2017 onwards are recommended to be included in the first wave of dossiers.
Cumulative
Quarterly
Duration
Please specify if your dossier will be single ou and site level or a global level/OU/PSNU level dossier or BOTH. If it is both, please specify which pages will be retained for a global version and which are only for single OU.
Review of Requirements Documents
As part of the management process to develop in Panorama, first a requirements document that has been reviewed by the technical inter agency community (including OGAC) needs to be submitted for review to ensure it meets the vision of the pano redesign and is consistent with the rest of the platform.
Requirements Documents Received
Requirements Documents on SharePoint ICPI>Clusters>DIV>Projects>Panorama Redesign>Requirements Docs >Requirements FY19Q4
Dataset Map (Excel) Received
Areas of Review