ICT2201-P6-9 / air-manager

0 stars 0 forks source link

WBS 2.1: Create component diagram for M2 #35

Open GMengRong opened 1 year ago

GMengRong commented 1 year ago

Creation of the Components Diagram of our product

GMengRong commented 1 year ago

[22/10/22] Created and listed the different components in diagram.

keefelee commented 1 year ago

[23/10/22] Created the draft with the initial interface connections between components. Included MVC architecture design.

Image

GMengRong commented 1 year ago

[23/10/2022] Identified and listed newer components based on the requirements to be met, adopting the form of MVC Software Architecture.

Image

GMengRong commented 1 year ago

[24/10/2022]

Image

GMengRong commented 1 year ago

[26/10/2022]

Image

GMengRong commented 1 year ago

[28/10/22]

Image