Open ThomasLohnert opened 1 year ago
This has already been started, and a draft is available at https://github.com/orgs/ISISComputingGroup/projects/5/views/1.
The scope for multiple repos is organisation level, and HLM for example is in ISIS Neutron Muon rather than our org, however, the notes in the non-classic projects will still allow visibility, and a link to the other repo put in the expanded session. Closed items can still be automated easily, the scripted ones (related to labels etc) potentially less so, but that is now something that can be looked into.
One of the things discussed as part of the away day was that we as a group would like to remove the distinction between IBEX and other work of the Controls Group (e.g. HLM).
To this end, we should look into creating a project board that contains tickets from other projects alongside IBEX work so it is all collected in one place and visible to everyone in the group. The new style Github projects allow incorporating tickets from multiple repositories. We should use this feature to set up a general "Controls work" project board to eventually replace the IBEX Project Board
Acceptance Criteria
What is the acceptance criteria?
How to Test
verbose instructions for reviewer to test changes (Add before making a PR)