đź“ť A Gaussian-process-model-based approach for robust, independent, and implementation-agnostic validation of complex multi-variable measurement systems: application to SAR measurement systems
GNU General Public License v3.0
0
stars
1
forks
source link
shading and plotting are misaligned in 'Verify' window #31
The Deviations plot has the same problem in the 'Verify' window as it does in the 'Confirm' window. The shading and the mpe line plot are misaligned.
The reason is that the data and shading are plotted starting at N = 1, but the mpe is plotted starting at N = 0.
They should be the same. Cedric prefers starting at N = 0. I don't have a preference. So let's start with N = 0 for all plots.
v1.0.12
The Deviations plot has the same problem in the 'Verify' window as it does in the 'Confirm' window. The shading and the mpe line plot are misaligned.
The reason is that the data and shading are plotted starting at N = 1, but the mpe is plotted starting at N = 0. They should be the same. Cedric prefers starting at N = 0. I don't have a preference. So let's start with N = 0 for all plots.