Closed ToxicTerror86 closed 9 months ago
You should place transformers to separate long cable lines or cables where many machines are connected in order to reduce lag.
In the crash report there are 229 Solar Panels, you should connect groups of 25 to a cable which connects to a transformer, afterwards you can connect all the output of those transformers to another transformer. The output of the last transformer can go to your machines.
oh ok thank you i was unaware of that i will let them know
FYI Energized Power cables where at least one energy producer is connect will check the whole network for energy consumers where energy is required and distributes energy evenly. In your case this is done 229 times for the whole network which is most likely very large. Transformers split the cable network into multiple parts.
we had a member that had 196 panels connected to try to supply a massive kingdom he was doing
crash-2024-01-13_19.32.25-server.txt
Im not sure whats causeing this but crash report says Energized Power its causing massive lag and crashing out my server