Resource Management for Space Launch Operations ATC Simulator
As an operations director, I want to be able to manage resources effectively within the air traffic control simulator to ensure efficient and safe space launch operations.
Acceptance Criteria
[ ] System can track all active and scheduled space launches.
[ ] System allows for the assignment and reallocation of launch pads.
[ ] System supports management of no-fly zones during launches.
[ ] System provides real-time updates on resource status.
[ ] System logs all changes made to resource allocations.
[ ] System supports the management of vehicle and personnel movements.
[ ] System restricts access to resource management based on user roles.
sequenceDiagram
participant Director as Operations Director
participant R_System as Resource Management System
Director->>R_System: Schedule space launch
R_System->>Director: Confirm launch pad assignment
Director->>R_System: Initiate no-fly zone
R_System->>Director: No-fly zone activated
R_System-->>Director: Real-time resource update
Resource Management for Space Launch Operations ATC Simulator
As an operations director, I want to be able to manage resources effectively within the air traffic control simulator to ensure efficient and safe space launch operations.
Acceptance Criteria