KwestResearch / engineering

Engineering Repositry
0 stars 0 forks source link

Change the way clicking on Surveys and Schedules works #39

Closed mccuskk closed 9 years ago

mccuskk commented 9 years ago

With this change the following happens -

If you click the Survey it will change everything below that is active to match itself. If it is part-enabled it will change everything below to enabled.

If you click the Schedule it will do the same for call plans below itself.

If you click call plans it will change the status of the schedule (and ultimately the survey). So if all call plans are disabled then the schedule will be disabled and the if there is only one schedule the surey will be disabled