Closed heather999 closed 2 years ago
@heather999 Since DC2 was released, are all those items above now done and we can close this issue? Thanks!
I had left this open in case we ever released PZs. Maybe we have moved beyond the point of needing updated PZs for DC2 release?
@sschmidt23 @aimalz
Hmm, I thought at some point this was brought up and we decided that with photo-z's available for dr3 and dr6 (and dr6a and dr6-v2) we wouldn't bother with dr2, but maybe my recollection is wrong.
DR2 has been released.
This issue is to capture the discussion concerning the preparation and validation of the DR2 release.
Prepare Pre-Release Data
Assemble Functional LSST Science Pipeline repository and determine the appropriate name for this release i.e. Run2.2i-dr2-v1
Catalogs
Add-On Catalogs
Validation
Final Preparations