Laixer / FunderMaps

Manage and visualize foundation data
Apache License 2.0
3 stars 1 forks source link

Adjust Foundation Type Model and Integrate Foundation Height Data #895

Open DonZandbergen opened 1 month ago

DonZandbergen commented 1 month ago

Description

Buildings constructed in 1800 or earlier cannot be supported by wooden piles. This adjustment needs to be reflected in the foundation type model. Additionally, foundation height data from research on established, cluster, and supercluster levels should be integrated and averaged per neighborhood per foundation type. This adjustment is applicable to wooden piles and wooden piles with extensions.

Example

Actions

Foundation Type Model Adjustment

  1. Model Adjustment

    • Update the foundation type model to ensure that buildings constructed in 1800 or earlier are not classified as being supported by wooden piles.
  2. Data Verification

    • Verify and update the existing data to reflect this change, ensuring all buildings constructed in 1800 or earlier are correctly classified.
  3. Testing and Validation

    • Test the updated model to ensure accuracy and consistency.
    • Validate that buildings constructed in 1800 or earlier are no longer classified as having wooden pile foundations.
  4. Documentation Updates

    • Update the documentation to reflect the changes in the foundation type model.
  5. Deployment

    • Deploy the updated model and data to the production environment.

Integration of Foundation Height Data

  1. Data Integration

    • Use foundation height data from research on established, cluster, and supercluster levels.
    • Calculate the average foundation height per neighborhood per foundation type.
    • Apply this metric to wooden piles and wooden piles with extensions.
  2. Distinguish Reliability

    • Differentiate the reliability of the data and analysis to provide a clearer risk assessment.
  3. Model Adjustment

    • Adjust the foundation type model based on the integrated foundation height data.
  4. Testing and Validation

    • Test the updated model to ensure accuracy and consistency with the integrated foundation height data.
    • Validate the results to confirm the correct application of foundation height data.
  5. Documentation Updates

    • Update the documentation to reflect the changes and the methodology for integrating foundation height data.
  6. Deployment

    • Deploy the updated model with integrated foundation height data to the production environment.

Expected Behavior