Problem
Optimism integration tests only assert to the validity of a single batch submission/derivation.
Proposed Solution
Extend the tests to write multiple batches and assert that derivation is able to read them. This will likely be very exhaustive when using holesky.
Problem Optimism integration tests only assert to the validity of a single batch submission/derivation.
Proposed Solution Extend the tests to write multiple batches and assert that derivation is able to read them. This will likely be very exhaustive when using holesky.