Closed JohnRDOrazio closed 2 weeks ago
This refactoring was done in Liturgical-Calendar/LiturgicalCalendarAPI/pull/256 which fixed Liturgical-Calendar/LiturgicalCalendarAPI/issues/253.
We need to do the same here.
This refactoring was done in Liturgical-Calendar/LiturgicalCalendarAPI/pull/256 which fixed Liturgical-Calendar/LiturgicalCalendarAPI/issues/253.
We need to do the same here.