MREUTZE / GA_Exact_HFSP

GA and Exact method for HFSP
MIT License
5 stars 0 forks source link

你好,请问参考文献可以分享一下吗?谢谢 #1

Closed wangconghui0 closed 1 year ago

MREUTZE commented 1 year ago

[1]Ni, F., Hao, J., Lu, J., Tong, X., Yuan, M.J., Duan, J., Ma, Y., & He, K. (2021). A Multi-Graph Attributed Reinforcement Learning based Optimization Algorithm for Large-scale Hybrid Flow Shop Scheduling Problem. Proceedings of the 27th ACM SIGKDD Conference on Knowledge Discovery & Data Mining. [2]Ruiz, R., & Rodríguez, J.A. (2010). The hybrid flow shop scheduling problem. Eur. J. Oper. Res., 205, 1-18. Ahmet Bolat, Ibrahim Al-Harkan, and Bandar Al-Harbi. 2005. Flow-shop scheduling for three serial stations with the last two duplicate. Computers & Operations Research , Vol. 32, 3 (2005), 647--667. [3]Fernandez-Viagas, V., & Framiñan, J.M. (2020). Design of a testbed for hybrid flow shop scheduling with identical machines. Comput. Ind. Eng., 141, 106288. [4]Dabiri, M., Yazdani, M., Naderi, B., & Haleh, H. (2021). Modeling and solution methods for hybrid flow shop scheduling problem with job rejection. Operational Research, 22, 2721-2765. [5]Jun, S., & Park, J. (2015). A hybrid genetic algorithm for the hybrid flow shop scheduling problem with nighttime work and simultaneous work constraints: A case study from the transformer industry. Expert Syst. Appl., 42, 6196-6204. [6]Ruiz, R., & Maroto, C. (2006). A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. Eur. J. Oper. Res., 169, 781-800. [7]Naderi, B., Zandieh, M., & Roshanaei, V. (2009). Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness. The International Journal of Advanced Manufacturing Technology, 41, 1186-1198. [8]Paternina-Arboleda, C.D., Montoya-Torres, J.R., Acero-Dominguez, M.J., & Herrera-Hernandez, M.C. (2004). Scheduling jobs on a k-stage flexible flow-shop. Annals of Operations Research, 164, 29-40. [9]Naderi, B., Ruiz, R., & Zandieh, M. (2010). Algorithms for a realistic variant of flowshop scheduling. Comput. Oper. Res., 37, 236-246. 多阶段混合排产问题研究报告—高级运筹学第6组.pdf

wangconghui0 commented 1 year ago

谢谢,请问如果想引用你们的工作,是直接引用这个链接吗?

MREUTZE commented 1 year ago

谢谢,请问如果想引用你们的工作,是直接引用这个链接吗?

是的

wangconghui0 commented 1 year ago

好的谢谢