MaREI-EPMG / times-ireland-model

TIMES-Ireland Model (TIM)
Other
10 stars 14 forks source link

Introduce reserve requirements in power sector #56

Open BakytzhanSuleimenov opened 5 months ago

BakytzhanSuleimenov commented 5 months ago

Possibility to introduce peaking equation in TIMES to model peak reserve requirement in power sector (grid code)