MarioniLab / oor_design_reproducibility

14 stars 1 forks source link

Analysis on number of control samples required #12

Closed emdann closed 1 year ago

emdann commented 1 year ago

Does the PAC design allow to use less control samples compared to PC design?

Plot AUPRC (or other metric) as a function of number of control donors for PC and PAC design (from 3 to 16 control donors). Take 3 random initialization for each number of samples, esp the lower numbers, to assess variance.

emdann commented 1 year ago

Optimizing