roof above the tunnel is leaking
#12
Closed
msimerson
closed
3 years ago
msimerson
commented
5 years ago
[x] patch: cover deck with plywood to push rain and snow out past leaking roof
[x] remove the deck above the roof
[x] tear off the existing roof and decayed portions of the tunnel
[x] repair any framing decay
[ ] install a new roof (perhaps roof/deck combo) over the tunnel
[ ] rebuild the shed above the front door with roof slope matching the main roof
[x] #28
[ ] #29
msimerson
commented
3 years ago
tearoff (2021-08-14)
repairing all sources of decay
msimerson
commented
3 years ago
Starting the Walls
Walls up
Deck laid and rails up
msimerson
commented
2 years ago
Meany Lodge Porch Assembly
[x] Stairs
[x] Set the pier blocks
[x] Level the soil around the stairs area
[x] Dig holes
[x] fill base of holes with pea gravel
[x] Construct the landing
[x] stairs are 7-1/2 x 10-1/4" so 37.5" below deck height
[x] Deck Rails
[x] Order Flashing / flashing / drip edge from B&D
[x] install fascia
[x] mount deck rail posts
[x] cut custom blocks for 4x4 posts
[x] (7) cut railing posts to 54"
[x] add 2x10" blocking for post bolts
[x] affix 3/8" threaded rod through the blocking
[x] Odds and Ends
[x] Cut 12' decking down to size
[x] mortar in top course of pillars
[x] fill with concrete
[x] set the post anchors
[x] make forms for steps at end of tunnel
[x] pour tunnel steps
[x] pour cores below glass blocks
[x] dig french drain along footing
[x] line with landscaping fabric
[x] fill with peat gravel
[x] tie into existing dry well
[x] Bear weight of fire escape to …
[x] hang the last outer joist
[x] Measure stair tread length, 40”
[x] mortar all gaps and cracks in the tunnel wall
[x] Decking
[x] lay starter strip at South edge of deck
[x] proceed across the deck
[x] Deck framing
[ ] install insect screen between joists & purlins
[x] trim joists to length
[x] cover joists with flashing tape
[x] lay purlins perpendicular to the joists
[x] TODO: acquire
[x] ledger bolts
[ ] 1/2" hot dipped galvanized bolts & nuts, max 29" on center
[x] Simpson SDWS, max 8" on center
[x] framing lumber
[x] 2x4x8' (38)
[x] 2x6x8' (2)
[x] 2x8x8' (2)
[x] 2x10x8' (19)
[x] 2x10x12' (2)
[x] 2x8x10' (2)
[x] 2x10x10' (7)
[x] insect screening
[x] hurricane ties
[x] joist hangers
[x] install sills on J-bolts
[x] attach ledgers to the lodge
[x] affix joist hangars to the ledger
[x] lay the joists
[x] affix joists to sill with hurricane ties
[x] Walls
[x] Lay remaining courses of blocks
[x] Cut (8) pieces of 1/2" rebar 3' long
[x] Cut (37) pieces of 1/2" rebar 2' long
[x] Fill cores with rebar per schedule
[x] Fill cores of wall with concrete
[x] Add rebar to bonded beam
[x] Lay out lines for block wall perimeter
[x] lay out doors & wall interior
[x] Install & brace door jambs
[x] cut or bend straps into door anchors
[x] Lay first course of blocks
[x] plumb, level, and square
[x] mark inside of blocks where rebar will go
[x] Lay next 5 courses of blocks
[x] Wait 5-6 hours
[x] TODO: acquire and deliver
[ ] ladder reinforcing
[x] masonry door anchors?
[x] cement blocks
[x] 8x8x8 std (58)
[x] 8x8x6 std (16)
[x] 8x8x16 bond beam (65)
[x] 8x8x16 split face (90)
[x] 8x8x16 std (225)
[x] (2) door jambs
[x] sacks of concrete (115) 80# to fill block cores (95 cu ft)
[x] sacks of type S mortar (34) 80#
[x] 3" x 3" angle iron $84
[x] Cut (46) pieces of 1/2" rebar 7' long
[x] Footings
[ ] tie rebar elbows into 1st course of blocks
[x] Pour
[x] TODO: acquire and deliver
[x] steel fire doors
[x] cement mixer
[x] 65 ft/3 of cement (110) 80#
[x] around new tunnel drain
[x] footings
[x] tie all rebar in footing
[x] drill holes in existing slabs for rebar tie-in
[x] dig footings
[x] build forms
[x] brace & remove fire escape post
[x] TODO: acquire
[x] rebar (12) of 5/8", (32) 1/2"
[x] (3) 12" bolts for post bracing
[x] buy drain & pipe
[x] form stakes
[x] pea gravel
[x] rent concrete saw
[x] cut out block of tunnel floor for drain
[x] dig out drain for tunnel
[x] remove 1/2 existing porch slab
[x] bust out existing concrete blocks
[x] cut off any existing rebar not in the right spot
Tools from Matt's Garage
[x] line level
[x] Rotohammer
[x] 1/2" SDS concrete bit
[x] laser level