Configurable ComputerCraft SCADA system for multi-reactor control of Mekanism fission reactors with a GUI, automatic safety features, waste processing control, and more! Please be sure to take a look at the Wiki tab, this project has lots of docs!
Split up RCS alarms based on what stabilizes seconds after a burn rate change and what is directly dependent on the turbine. Calculate out the rotation rate and use that to determine when checks can be ran without false tripping.
Split up RCS alarms based on what stabilizes seconds after a burn rate change and what is directly dependent on the turbine. Calculate out the rotation rate and use that to determine when checks can be ran without false tripping.