Closed YUANWONGSATHORN closed 3 months ago
The numbering of boilers and turbines is on a per-reactor basis. If you have 4 turbines split across 4 reactors (one for each) you would have four "Turbine 1"s, each assigned to a different unit.
The numbering of boilers and turbines is on a per-reactor basis. If you have 4 turbines split across 4 reactors (one for each) you would have four "Turbine 1"s, each assigned to a different unit.
oh i get it Thankyou so much 🤍
Great, happy to help! :)
Describe the bug hi i have a problem that i connect reactor unit 1-2 using turbine 1 and reactor unit 3-4 for turbine number 2 and when i go look in the main and flow monitor it show Turbine 2 that use for reactor 3-4 offline but turbine for unit 1-2 is normal i have already try update software but it didn't work is there something i missing? can you help me?
Screenshots and Logs Here what main and flow monitor show Here is RTU gateway right is turbine 1 and left is turbine 2