MikaylaFischler / cc-mek-scada

Configurable ComputerCraft SCADA system for multi-reactor control of Mekanism fission reactors with a GUI, automatic safety features, waste processing control, and more! Please be sure to take a look at the Wiki tab, this project has lots of docs!
https://www.youtube.com/@cc-mek-scada
MIT License
336 stars 13 forks source link

RTU gateway error? #503

Closed YUANWONGSATHORN closed 3 months ago

YUANWONGSATHORN commented 3 months ago

Describe the bug hi i have a problem that i connect reactor unit 1-2 using turbine 1 and reactor unit 3-4 for turbine number 2 and when i go look in the main and flow monitor it show Turbine 2 that use for reactor 3-4 offline but turbine for unit 1-2 is normal i have already try update software but it didn't work is there something i missing? can you help me?

Screenshots and Logs Here what main and flow monitor show 2024-06-27_19 03 12 2024-06-27_19 03 19 Here is RTU gateway 2024-06-27_19 04 00 right is turbine 1 and left is turbine 2 2024-06-27_19 04 09

MikaylaFischler commented 3 months ago

The numbering of boilers and turbines is on a per-reactor basis. If you have 4 turbines split across 4 reactors (one for each) you would have four "Turbine 1"s, each assigned to a different unit.

YUANWONGSATHORN commented 3 months ago

The numbering of boilers and turbines is on a per-reactor basis. If you have 4 turbines split across 4 reactors (one for each) you would have four "Turbine 1"s, each assigned to a different unit.

oh i get it Thankyou so much 🤍

MikaylaFischler commented 3 months ago

Great, happy to help! :)