Would the limiter also function as a way to better time the parallel plotting delay? i.e. instead of global delay time, the plotter could monitor log files and start the next plot as soon as phase 1 on previous plot finishes?
That would be great. Kindly go ahead.
As this is open, I don't want to add as another issue. Hence adding here itself: i Believe a solution for this could accelerate the number of plots creation. In the example marked in the picture, i can have an additional k34 plot instead of k33. Kindly look into it and advise. May be a bypass option can be appropriately provided. [Only thing to avoid is a the peak of max 900MB space requirement should not come simultaneously in each k34 for the specified K Drive] for example if cond1) its not Phase 1 and cond 2) the maximum space requirement of the k34 finished (I believe this happens in Phase3), if empty space is available in the drive another queued one can get active.
Peak Temp size for k34 in Phase3 as observed:
Had sent few Chias as a token of appreciation for the best plotter.
request urgently options for: Global phase 1 limiter a) per each temp drive b) for all "queued plots"