To batch prepare as many Campaigns as possible for visualization (by @willemarcel when back in Sprint 4/5)
Since Wille will be out for the next sprint and a half, we will use this sprint to focus on data collection. By now we have a process in which @praveenphatate owns data gathering and preparation of YAML files for Wille. Praveen will connect with @als0076 as needed to support.
Noted block: Praveen doesn't have access to some Campaign data. So for this sprint we will focus on remaining campaigns Praveen does have access to.
Expected Outcome
A set of YAML files for Wille to then focus on the visualization aspect in later sprints
A comment added to this issue of which Campaign data were gathered
Since the number will depend on both the nuances of the data and time from Ashlyn to support, we will not put a specific number here but at least 5 campaigns would be ideal.
Goal
To batch prepare as many Campaigns as possible for visualization (by @willemarcel when back in Sprint 4/5)
Since Wille will be out for the next sprint and a half, we will use this sprint to focus on data collection. By now we have a process in which @praveenphatate owns data gathering and preparation of YAML files for Wille. Praveen will connect with @als0076 as needed to support.
Expected Outcome