NASA-PDS / operations

Tickets for the PDSEN Operations Team
Other
5 stars 1 forks source link

[nssdca-delivery] urn:nasa:pds:orex.tagcams V12.0 #422

Closed beatricemueller closed 4 months ago

beatricemueller commented 10 months ago

Discipline Node Information

NOTE: If you have multiple delivery packages, we strongly encourage you to submit these in batches of 3 to 10 per issue with one ZIP file of the packages and another ZIP file of the validation reports. Please use a descriptive title, such as "Node Mission misc batch #".


Engineering Node Process

See the internal EN process at https://pds-engineering.jpl.nasa.gov/content/nssdca_interface_process

beatricemueller commented 10 months ago

The validation report has a few warnings which were all evaluated and can be ignored.

c-suh commented 9 months ago

@beatricemueller, this set has been posted for NSSDCA processing. From tomorrow, you can check the status at https://nssdc.gsfc.nasa.gov/psi/ReportPDS4.jsp using the SIP LID below:

SIP LID:

oddes commented 8 months ago

10/16/2023: Status is Pre-Ingest: Not yet Processed/Archived.

jordanpadams commented 7 months ago

Status verified on 11/30/2023: SIPs are still awaiting ingest

jordanpadams commented 6 months ago

@beatricemueller all packages have been validated by NSSDCA and submitted to Ingest. NSSDCA has now taken responsibility for an additional copy of this data

jordanpadams commented 6 months ago

Re-opening. These have Pre-ingest status

c-suh commented 4 months ago

urn:nasa:pds:system_bundle:product_sip_deep_archive:orex.tagcams_v12.0_20230818 is Processed. It has been validated by NSSDCA, submitted to Ingest, and Ingested. NSSDCA has now taken responsibility.