Closed mollybsmith-noaa closed 4 months ago
Judy has asked that we backfill FV3_GSL_Chem and FV3_GSL_C384 to Feb 1st. I will do this for METplus, and Jeff or Natalie can do it for RAOBs and possibly surface verification.
I backfilled these in order to test the move to Rocky 8. It all works!
Judy has asked that we backfill FV3_GSL_Chem and FV3_GSL_C384 to Feb 1st. I will do this for METplus, and Jeff or Natalie can do it for RAOBs and possibly surface verification.