**MEASURE APPLICABILITY**
0 = Success
**INITIAL CONDITION**
Construction ASHRAE 189.1-2009 ExtWall SteelFrame ClimateZone 4-8 has 0 lifecycle cost objects.
**FINAL CONDITION**
A new lifecycle cost object was added to construction ASHRAE 189.1-2009 ExtWall SteelFrame ClimateZone 4-8 with an area of 1,377 (ft^2). Material and Installation costs are $6,885.
**INFO MESSAGES**
**WARNING MESSAGES**
**ERROR MESSAGES**
***Machine-Readable Attributes**
(removed more content to make this shorter)
</system-out>
<system-err>
/Users/dgoldwas/.rbenv/versions/2.2.4/lib/ruby/gems/2.2.0/gems/ci_reporter-2.0.0/lib/ci/reporter/test_suite.rb:54: warning: instance variable @capture_out not initialized
/Users/dgoldwas/.rbenv/versions/2.2.4/lib/ruby/gems/2.2.0/gems/ci_reporter-2.0.0/lib/ci/reporter/test_suite.rb:55: warning: instance variable @capture_err not initialized
/Users/dgoldwas/.rbenv/versions/2.2.4/lib/ruby/gems/2.2.0/gems/ci_reporter-2.0.0/lib/ci/reporter/report_manager.rb:51: warning: File.exists? is a deprecated name, use File.exist? instead
</system-err>```