On importing a gbXML file in the gbxml hvac import measure, an air system should have it's state set as to whether it should build as a DOAS or a traditional VAV system. The logic should happen as follows:
The air system should operate as a traditional air system unless any zone has multiple zone equipment where one is an air system based zone equipment (i.e. VAV box) that draws ventilation then the air system should be a DOAS
There are obviously some weird scenarios that could arise, but we can log those here and translate them to UI/UX stories on Autodesk's side.
On importing a gbXML file in the gbxml hvac import measure, an air system should have it's state set as to whether it should build as a DOAS or a traditional VAV system. The logic should happen as follows:
The air system should operate as a traditional air system unless any zone has multiple zone equipment where one is an air system based zone equipment (i.e. VAV box) that draws ventilation then the air system should be a DOAS
There are obviously some weird scenarios that could arise, but we can log those here and translate them to UI/UX stories on Autodesk's side.