It may be better to have a method that returns the HVAC schedule for a subset of zones, not the full model. Though that is easy to add later
The method that adds infiltration probably should be separated from the method that sets the infiltration schedules. The reason being is that we'll want to add infiltration values in the off conditions for design sizing for HVAC systems, and then later adjust the infiltration on/off schedules to account for HVAC system operation.
We don't have a way to account for the cycling nature of HVAC systems and moving between on/off infiltration regimes
Pull request overview
Pull Request Author
bundle exec rake doc
)bundle exec rake rubocop
)Review Checklist
This will not be exhaustively relevant to every PR.