Bug Description
Currently we drop all SC Points > 1000MW (max_cap)
Expected behavior
We need to map SC Points > max_cap to the features with the maximum capacity
tie-line cost needs to be scaled by a multiple of SC Cap // max_cap
Charge code
If you are at NREL and fixing this bug is urgent, please provide a charge code for our time.
Bug Description Currently we drop all SC Points > 1000MW (max_cap)
Expected behavior We need to map SC Points > max_cap to the features with the maximum capacity tie-line cost needs to be scaled by a multiple of SC Cap // max_cap
Charge code If you are at NREL and fixing this bug is urgent, please provide a charge code for our time.