Checked means that something in resstock was changed or updated as a result of pulling in.
Questions:
Should we re-think when/where validation on the HPXML file is performed? Currently we skip validation from HPXMLtoOpenStudio. Instead, we validate both before and after applying defaults from BuildExistingModel and ApplyUpgrade. (We apply defaults from ApplyUpgrade so that home.xml looks similar to the home.xml produced when there are no upgrades.) Validation therefore happens 2 times for a home with no upgrade, and 4 times for a home with an upgrade. Should we switch back to having HPXMLtoOpenStudio do the validation? Then we would only be validating 2 times (when no upgrade) or 3 times (when upgrade).
Pull Request Description
Pulls in:
Checked means that something in resstock was changed or updated as a result of pulling in.
Questions:
Checklist
Not all may apply:
openstudio tasks.rb update_measures
has been run