Closed mmannion closed 1 year ago
Held/wet measurements are captured multiple times per groundwater measurement because:
Cardinality FOR STEEL TAPE:
CARDINALITY FOR OTHERS:
RE: CARDINALITY, EACH "ATTEMPT" IS A WHOLE SEPARATE GROUNDWATER MEASUREMENT. DON'T CREATE NEW RELATED TABLE; JUST MORE ROWS IN EXISTING GROUNDWATERMEASUREMENT.
GroundwaterMeasurement
table:
ManualMethod
ManualMethodComments
ManualLevelHeld
ManualLevelWet
ManualLevel
value from ManualLevelHeld
and ManualLevelWet
when using steel tapeMLR updated survey to include
ManualMethod
ManualMethodComments
ManualLevelHeld
ManualLevelWet
Rename / reorder questions per team meeting (see @mripp notes in Word doc)
MLR updated survey
Example to demo 001384
Need to capture method staff used to measure groundwater levels. Domain values are:
Include comments for Other choices, per #75
When measuring groundwater, if staff uses "Steel tape" (see #76), we also need to capture:
Groundwater level is calculated from these measurements