Closed jhasick closed 11 months ago
@jhasick thanks for your feedback. We'll update the doc accordingly.
@jhasick this document had been updated here: https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/migrate-cn1610.html.
Thanks for your feedback.
Page URL
https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/migrate-cn1610.html
Page title
Migrate CN1610 cluster switches to BES-53248 cluster switches
Summary
There seem to be several typos in this doc, and it's confusing to customers....
Step 6: The example provided only includes the ISL ports and not the node ports. If the customer simply runs this, then all they are shutting down are the ISL ports.
Also, the Overview indicates we are replacing CL2 switch first, so step 6 should read 'On cluster switch CL2, shut down the ports connected to the cluster ports of the nodes'
Step 9: Should read 'Move all cluster node connection cables from the old CL2 switch to the new cs2 switch.'
Step 13: Should read 'On cluster switch CL1, shut down the ports connected to the cluster ports of the nodes.'
Public issues must not contain sensitive information