NetAppDocs / ontap-systems-upgrade

https://docs.netapp.com/us-en/ontap-systems-upgrade/
0 stars 7 forks source link

Need to add bullet to move 6-1/6-2 sub-slot blank cartridges over to new NVRAM11 module #61

Closed andris-ntap closed 1 year ago

andris-ntap commented 2 years ago

Page: Retire node1

Field feedback is showing some confusion about what to do with the blank modules that go into 6-1 and 6-2. I'd like to add this 1st bullet in the list in this section (Stage 2) and the equivalent section in Stage 4 (for node 2).

You must install the AFF A900 or FAS9500 NVRAM and controller modules that you received for the upgrade on node1.

Similar addition in Stage 4.

netapp-pcarriga commented 2 years ago

@andris-ntap - Thanks for providing this feedback, tracking in BURT 1506458.

netapp-pcarriga commented 1 year ago

@andris-ntap The updates are now published on the following pages: Install the AFF A900 or FAS9500 NVRAM and controller modules on node1 Install the AFF A900 or FAS9500 NVRAM and controller modules on node2 Thanks again!