NetAppDocs / ontap-systems

https://docs.netapp.com/us-en/ontap-systems/
1 stars 14 forks source link

Please add how many Rack Units the chassis requires #273

Closed aneises1 closed 2 months ago

aneises1 commented 2 months ago

Page URL

https://docs.netapp.com/us-en/ontap-systems/c800/install-detailed-guide.html

Page title

Detailed steps - AFF C800

Summary

For an example see the A70 install guide. --> https://docs.netapp.com/us-en/ontap-systems/a70-90/install-prepare.html#step-1-prepare-the-site

Step 1: Prepare the site Make sure that the site and the cabinet or rack you plan to use meet the specifications for your storage system.

Steps Confirm that your site meets the environmental and electrical requirements for your platform as shown in the NetApp Hardware Universe.

Make sure you have adequate rack space:

4U for the platform chassis

2U for each NS224 shelf

Install any required network switches near the platform.

See the Switch documentation for installation instructions and NetApp Hardware Universe for compatibility information.

Public issues must not contain sensitive information

dougthomp commented 2 months ago

@aneises1 Thanks for the feedback. We can add the space requirements data to this doc (I will, as requested). However, there is a link to the NetApp Hardware Universe, where this information is also available.

dougthomp commented 2 months ago

U requirements added to C800 and A800. Closing the issue.