Closed aneises1 closed 2 months ago
@aneises1 Thanks for the feedback. We can add the space requirements data to this doc (I will, as requested). However, there is a link to the NetApp Hardware Universe, where this information is also available.
U requirements added to C800 and A800. Closing the issue.
Page URL
https://docs.netapp.com/us-en/ontap-systems/c800/install-detailed-guide.html
Page title
Detailed steps - AFF C800
Summary
For an example see the A70 install guide. --> https://docs.netapp.com/us-en/ontap-systems/a70-90/install-prepare.html#step-1-prepare-the-site
Step 1: Prepare the site Make sure that the site and the cabinet or rack you plan to use meet the specifications for your storage system.
Steps Confirm that your site meets the environmental and electrical requirements for your platform as shown in the NetApp Hardware Universe.
Make sure you have adequate rack space:
4U for the platform chassis
2U for each NS224 shelf
Install any required network switches near the platform.
See the Switch documentation for installation instructions and NetApp Hardware Universe for compatibility information.
Public issues must not contain sensitive information