Closed paulakeen closed 5 years ago
Share Tenderer Structure Works from PEPPOL.
It was concluded to split the roles to better distinguish between these different concepts. However in principal both are responsible to communicate to the CA. A split of roles might be also better for integration with eCERTIS. Code list should be extended with two new additional codes one for sole contractor and one for lead entity. There should be a maintenance guideline for the code list illustrating the changes done.
Decision (see Mondorf, 22 Mar) will be applied in v2.0.3.
This issue has been solved in version 2.1.0 of the ESPD-EDM
The current version of the ESPD-EDMv2.0.0 defines one single code "SCLE" to both Sole Contractor and Lead Entity.
This is an inconvenient and error-prone when the times comes to draft schematron rules in order to decide whether the role of the economic operator and determine which additional information needs to be required or not.
For version 2.0.1 the rule to distinguish whether the economic operator is a Leader consists in:
The EO role code = SCLE AND the element "/cbc:EconomicOperatorGroupName" contains a value.
We propose to discuss this and promote a solution for the release 2.0.2.