OSE / ironworker

http://opensourceecology.org/wiki/Ironworker
2 stars 2 forks source link

Update 3d model: Add upright alignment tubes near cylinder #2

Open marcinose opened 11 years ago

marcinose commented 11 years ago

Dan did it, need to update the 3D model, BOM, and Assembly Instructions

dbenamy commented 11 years ago

We need to take a picture of how it's assembled. Then people at fef or remote can update docs.

dbenamy commented 11 years ago

Here's what it looks like:

img_9680

dbenamy commented 11 years ago

I put it in the assembly instructions- http://opensourceecology.dozuki.com/Guide/Ironworker+Frame/83/1

Still need to update the 3d model and BOM.

dbenamy commented 11 years ago

There are two 3d models floating around: http://opensourceecology.org/wiki/File:IronworkerI.skp, and http://opensourceecology.org/wiki/File:IronworkerBOM.skp which has the design and bill of materials. I don't know if they have the same model or not. If one is obviously more up to date, use that one, otherwise use the one without the BOM.

Download it, make the changes, and upload the result here or to a new file name on the wiki (you can log in with a google account using the openid login link in the top right).

You should copy and paste pieces from the "warehouse" of standard parts. We have a model with all of them- http://opensourceecology.org/wiki/Warehouse

dbenamy commented 11 years ago

BOM is generated from instructions now so we just need to update 3d model.