Open sarob opened 1 year ago
I have an erigon node loading, still on step 7 with the CPUs pegged for the last week. My estimate is it using about 2.4 kWh daily.
The follow up meeting with Alex, TJ and team on post building her erigon ethereum dAppnode is this Thursday.
Alex recorded meeting TJ asks
Alex is using a lower tier QuickStart dappnode out of her house, 62RAM, 3.5TB Zen is using VPN to get into alex’s network Trueblocks is not yet running on a dappnode as TJ doesn’t have the resources
Alex choose erigon setup as ETH archive node erigon works in stages. 14 stages before any blocks are record. Gitcoin plans utilize optimism in the future Trueblocks can dump a CSV file Next meeting in 2 week as ETH node synch will take that long