Closed jsurabhi501 closed 4 years ago
You need a larger wind file. The wind file you have only contains 46.95 seconds of data. However, when the simulation initializes, the wind box is shifted downwind by a little more than half a wind turbine rotor, which for your turbine running in 12 m/s wind is a shift of ~7 seconds, so the wind box is past the turbine when the simulation ends at ~43 seconds.
Hello,
I am trying to run Test13 for the WP_1.5 MW tower to find out flexural moment at the top and bottom of the tower. First I run the test for 40s TMax and get results. Next time, I run the test for 100 s TMax I am getting a fatal error. Can you please guide me on how to solve this error? Is it related to the Dt-time step? Do they have specific limits to set the value of the DT-time step?