Issue:
Example: Proposal 50784
Issue: There are no estimated times on the line items.
When I get asked to quote a lead time, I am using the estimated times to help me determine how long it will take to build the product. When it says 0 on the line item for everything, then I have to go into Ore3D and look at each of the children and add them all up to get the total time for each line. This is very time consuming; especially when there are 7 children with multiple quantities on each.
Solution:
Have the total times show up in the parent or have the line item in NS show the total estimated time for each operation.
Issue: Example: Proposal 50784 Issue: There are no estimated times on the line items.
When I get asked to quote a lead time, I am using the estimated times to help me determine how long it will take to build the product. When it says 0 on the line item for everything, then I have to go into Ore3D and look at each of the children and add them all up to get the total time for each line. This is very time consuming; especially when there are 7 children with multiple quantities on each.
Solution: Have the total times show up in the parent or have the line item in NS show the total estimated time for each operation.