Closed JoeHoffman closed 8 years ago
Notes:
My guess is that it is because the segment is 26 yrs from failure, with only one bad seg. The liner option looks like it is coming in way too high though. Any thoughts as to why? Was that due to "replacing all laterals?". Also, have we pushed SPs back to 40 yrs already? (and subsequently all other repairs +10 yrs)
This particular pipe receives a 'Do nothing' solution because it requires a gate, and is next to other pipes that require gates. This is an area where surcharging, grade 4 pipes between replace pipes, and high risk all converge.
The newer calculations (REHAB_Branches) for liner show the cost of the liner is $46,085. (Column APWCIPP01)
The long term solution for this pipe, under the new processes, shows a spot. I think that's what we want here. nBCR_Data shows its a 'Do Nothing' base on extended failure year, which is also what we want (more than 20 years to failure).