Build into the model industry flexibility from Synergie project: around 9.1 GW that can shift for 4 hours. Build as virtual storage of power 9.1 GW, energy 9.1 GW * 4 h = 36.4 GWh, force state of charge to be zero at midnight (to prevent load shifting over days). Regionalise using the industry electricity demand as distribution key. May want to let the state of charge go negative as well (if load shift starts with a load increase).
Ask Micha or Tom for more detailed CSV on load shifting
Build into the model industry flexibility from Synergie project: around 9.1 GW that can shift for 4 hours. Build as virtual storage of power 9.1 GW, energy 9.1 GW * 4 h = 36.4 GWh, force state of charge to be zero at midnight (to prevent load shifting over days). Regionalise using the industry electricity demand as distribution key. May want to let the state of charge go negative as well (if load shift starts with a load increase). Ask Micha or Tom for more detailed CSV on load shifting