This change primarily updates unit-commitment parameters, ramping rates, and heat-rates for non-WECC generators.
Generators with missing Unit-commitment and ramping (#60 ) parameters are assigned values from EIA-technology based capacity weighted averages from the ADS
Likewise for the few plants missing e-grid heat-rates we update based on technology level capacity weighted averages.
16 Fix to ensure most of the renewable plants are added to the system. A small residual remains, need to investigate further why these aren't added to the network.
Checklist
[x] I tested my contribution locally and it seems to work fine.
[x] Code and workflow changes are sufficiently documented.
[ ] Changed dependencies are added to envs/environment.yaml.
[ ] Changes in configuration options are added in all of config.default.yaml.
[ ] Changes in configuration options are also documented in doc/configtables/*.csv.
This change primarily updates unit-commitment parameters, ramping rates, and heat-rates for non-WECC generators.
16 Fix to ensure most of the renewable plants are added to the system. A small residual remains, need to investigate further why these aren't added to the network.
Checklist
envs/environment.yaml
.config.default.yaml
.doc/configtables/*.csv
.