Open p-glaum opened 10 months ago
We could think about using some of the cost data from North Sea Wind Power Hub datasets found at https://zenodo.org/records/10101328. I think especially for the electrolysis cost and the power transmission cost, we could take their cost assumptions.
Transmission cost Electrolysis cost
Until now we assumed alkaline electrolysis and not PEM because these are the once most commonly used currently. We can discuss it next week!
We could think about using some of the cost data from North Sea Wind Power Hub datasets found at https://zenodo.org/records/10101328. I think especially for the electrolysis cost and the power transmission cost, we could take their cost assumptions.