Closed pre-commit-ci[bot] closed 1 year ago
Report bugs in Issues
The following are automatically added:
.pre-commit-config.yaml
exists in the repo.Available user actions:
/wip
to the PR, To remove it from the PR comment /wip cancel
to the PR./hold
, To un-block merging of PR comment /hold cancel
./verified
to the PR, to un-verify comment /verified cancel
to the PR.
verified label removed on each new commit push./cherry-pick <target branch to cherry-pick to>
in the PR.
/cherry-pick branch1 branch2
)/build-and-push-container
in the PR (tag will be the PR number)./<label name>
, to remove, use /<label name> cancel
/lgtm
Owner of the pull request is redhat-qe-bot
Pull request is merged automatically.
New container for quay.io/redhat_msi/openshift-ci-trigger:latest published
updates: