As written in the rubric for design documents " Full testing/verification does not have to be part of the timeline, but enough testing has to be included to have confidence in Rev 0", it would be better if the timeline section in System Design Document can have some tests scheduled in it to be prepared for the Rev 0 demo.
As written in the rubric for design documents " Full testing/verification does not have to be part of the timeline, but enough testing has to be included to have confidence in Rev 0", it would be better if the timeline section in System Design Document can have some tests scheduled in it to be prepared for the Rev 0 demo.