Use SHS information to understand SHS electrification status at the highest granularity available. Due to lack of granular data on SHS we suggest the following:
-- Include the No. of SHS systems/connections etc. as a separate line in summary table with an estimate of their (existing) capacity/investment that is already deployed. That way, the SHS output of the OnSSET model can be provided as a range.
Use SHS information to understand SHS electrification status at the highest granularity available. Due to lack of granular data on SHS we suggest the following:
-- Include the No. of SHS systems/connections etc. as a separate line in summary table with an estimate of their (existing) capacity/investment that is already deployed. That way, the SHS output of the OnSSET model can be provided as a range.